Structural Rebuild covers load-bearing repair through final inspection, coordinated with your Union building department at every stage.
📞 Call +1-866-484-1409 Now
Full GC oversight, not subcontracted piecemeal.
Inspections built into the schedule, not an afterthought.
A written price and schedule before framing begins.
A defined timeline with milestones, not open-ended.

Inspected before any finish work covers it up.
Fire-damaged trusses replaced with engineered lumber matched to span.
All required permits filed with your local Union building department.
Installed to code once framing passes inspection.
Trim, doors, and cabinetry complete the rebuild's finished look.
Certificate of occupancy coordinated with Union inspectors.
A technician answers and lines up a structural evaluation.
A project lead arrives to evaluate structural scope in person.
You approve the plan and permits before construction.
Construction proceeds through inspections to a final walkthrough.
"Passing structural inspection on the first attempt said a lot about the work quality." — Homeowner, Union
"They handled all the permit scheduling with the city, which would've been a nightmare for us to manage." — Homeowner, Union, OR
"We expected delays, but the rebuild finished close to the original timeline quoted." — Homeowner, Union
Included as part of the standard scope.
Most projects run six to twelve weeks from permit to final inspection.
Licensed to manage the complete construction process.
Significant damage typically gets engineer review first.
We provide the paperwork adjusters need.
We keep Union rebuild projects on schedule by managing permitting directly.
